Research Article

Profit Comparisons of Computer System with S/w Redundancy Subject to Preventive Maintenance Concept

by  V.J. Munday, Permila
journal cover
International Journal of Computer Applications
Foundation of Computer Science (FCS), NY, USA
Volume 187 - Issue 35
Published: August 2025
Authors: V.J. Munday, Permila
10.5120/ijca2025925491
PDF

V.J. Munday, Permila . Profit Comparisons of Computer System with S/w Redundancy Subject to Preventive Maintenance Concept. International Journal of Computer Applications. 187, 35 (August 2025), 31-35. DOI=10.5120/ijca2025925491

                        @article{ 10.5120/ijca2025925491,
                        author  = { V.J. Munday,Permila },
                        title   = { Profit Comparisons of Computer System with S/w Redundancy Subject to Preventive Maintenance Concept },
                        journal = { International Journal of Computer Applications },
                        year    = { 2025 },
                        volume  = { 187 },
                        number  = { 35 },
                        pages   = { 31-35 },
                        doi     = { 10.5120/ijca2025925491 },
                        publisher = { Foundation of Computer Science (FCS), NY, USA }
                        }
                        %0 Journal Article
                        %D 2025
                        %A V.J. Munday
                        %A Permila
                        %T Profit Comparisons of Computer System with S/w Redundancy Subject to Preventive Maintenance Concept%T 
                        %J International Journal of Computer Applications
                        %V 187
                        %N 35
                        %P 31-35
                        %R 10.5120/ijca2025925491
                        %I Foundation of Computer Science (FCS), NY, USA
Abstract

In this paper, author focus on the profits of a computer system with software redundancy by introducing the concept of hardware preventive maintenance (PM), priority to hardware PM and hardware repair over software up-gradation. The system fails independently from normal mode. All the repair activities such as hardware repair, software up-gradation, hardware preventive maintenance before failure and hardware replacement after maximum repair time are carried out by a single server immediately, if required. All random variables are statistically independent. The negative exponential distribution is taken for the failure time of the component while the distributions of repair time, up-gradation time, preventive maintenance and replacement time are assumed arbitrary with different probability density functions. Semi-Markov process and regenerative point technique are used for obtaining the values of various parameters. The behaviour of profits has been examined.

References
  • Osaki, S. 1972, Reliability analysis of a two-unit standby redundant system with preventive maintenance, IEEE Transactions on Reliability, vol. R-21 (1), pp. 24 – 29.
  • Malik, S.C., Nandal, P. and Barak, M.S. 2009, Reliability Analysis of a System under Preventive Maintenance, Journal of Mathematics and System Sciences, vol. 5 (1), pp. 92 – 115.
  • Anand, Jyoti and Malik, S.C. 2012, Analysis of a Computer System with Arbitrary Distributions for H/W and S/W Replacement Time and Priority to Repair Activities of H/W over Replacement of the S/W, International Journal of Systems Assurance Engineering and Management, vol.3 (3), pp. 230-236.
  • Kumar, Jitender; Kadyan, Mukender Singh and Malik, Suresh Chander. 2012, Cost-analysis of a two-unit cold standby system subject to degradation, inspection and priority, Maintenance and Reliability, vol. 14(4), pp. 278-283.
  • Malik, S.C. and Sureria, J.K. 2012 Profit Analysis of a Computer System with H/W Repair and S/W Replacement, International Journal of Computer Applications, vol.47(1), pp. 19-26.
  • Malik, S.C. 2013, Reliability modeling of a computer system with preventive maintenance and priority subject to maximum operation and repair times, International Journal of System Assurance Engineering and Management, vol. 4 (1), pp. 94-100.
  • Barak, Sudesh K. and Malik, S.C. 2014, A Standby System with Priority to Repair over Preventive Maintenance, International Journal of Engineering Research (IJER), vol. 3(4), pp. 241-244.
  • Malik, S.C. and Munday, V.J. 2014, Stochastic Modeling of a Computer System with Hardware Redundancy, International Journal of Computer Applications, vol. 89(7), pp. 26-30.
  • Kumar, Ashish, Barak, Monika S and Malik, S.C. 2015, Economic Analysis of a Computer System with Software Up-gradation and Priority to Hardware Repair over Hardware Replacement Subject to Maximum Operation and Repair Times, International Journal of Scientific and Engineering Research, vol. 6(4), pp. 1661-1668.
  • Munday, V.J. and Malik, S.C. 2015, Stochastic modelling of a computer system with software redundancy, International Journal of Engineering and Management Research, vol. 5(1), pp.295-302.
  • Munday, V.J., Permila and Malik, S.C. 2016, Reliability modelling of a computer system with hardware redundancy subject to preventive maintenance, International Journal of Statistics and Reliability Engineering, vol. 3(2), pp. 176-189.
  • Munday, V.J., Permila and Malik, S.C. 2019, Analysis of a computer system with software redundancy subject to preventive maintenance, International Journal of Engineering Research and Technology, vol. 8(12), pp. 604-610.
  • Munday, Vikram and Permila 2023, Profit Analysis of a computer system with software redundancy subject to Hardware PM and MRT, Leadership, Education, Personality: An Interdisciplinary Journal, vol. 18(11), pp. 121-135.
  • Munday, Vikram and Permila 2024, Profit Comparison of a Computer System with Software Redundancy with Priority to One Component over Other, International Journal of Science and Research Methodology (IJSRM), Vol. 27 (08), pp. 6-16.
Index Terms
Computer Science
Information Sciences
No index terms available.
Keywords

Computer System Software Redundancy Preventive Maintenance Replacement and Profit Analysis