Call for paper last date Nov. 20, 2026, 11:59 p.m. Submit
Research Article

Integrating the Project Life Cycle and the Six Constraints for Sustainable Environmental Project Management: A Conceptual Synthesis with a Comparative Case Illustration

by  Chidubem Blessing Okogwu, Chinonso Job
journal cover
International Journal of Computer Applications
Foundation of Computer Science (FCS), NY, USA
Volume 187 - Issue 147
Published: October 2026
Authors: Chidubem Blessing Okogwu, Chinonso Job
10.5120/ijcaa337e7a7dc43
PDF

Chidubem Blessing Okogwu, Chinonso Job . Integrating the Project Life Cycle and the Six Constraints for Sustainable Environmental Project Management: A Conceptual Synthesis with a Comparative Case Illustration. International Journal of Computer Applications. 187, 147 (October 2026), 19-24. DOI=10.5120/ijcaa337e7a7dc43

                        @article{ 10.5120/ijcaa337e7a7dc43,
                        author  = { Chidubem Blessing Okogwu,Chinonso Job },
                        title   = { Integrating the Project Life Cycle and the Six Constraints for Sustainable Environmental Project Management: A Conceptual Synthesis with a Comparative Case Illustration },
                        journal = { International Journal of Computer Applications },
                        year    = { 2026 },
                        volume  = { 187 },
                        number  = { 147 },
                        pages   = { 19-24 },
                        doi     = { 10.5120/ijcaa337e7a7dc43 },
                        publisher = { Foundation of Computer Science (FCS), NY, USA }
                        }
                        %0 Journal Article
                        %D 2026
                        %A Chidubem Blessing Okogwu
                        %A Chinonso Job
                        %T Integrating the Project Life Cycle and the Six Constraints for Sustainable Environmental Project Management: A Conceptual Synthesis with a Comparative Case Illustration%T 
                        %J International Journal of Computer Applications
                        %V 187
                        %N 147
                        %P 19-24
                        %R 10.5120/ijcaa337e7a7dc43
                        %I Foundation of Computer Science (FCS), NY, USA
Abstract

Environmental projects are delivered under the same generic project life cycle and six-constraint structure (time, cost, scope, quality, resources and risk) used across the project management discipline, but sustainability requirements change what each phase and each constraint must accomplish. This paper synthesises peer-reviewed project management and sustainability-accounting literature to examine how the initiation, planning, execution/monitoring and closing phases interact with the six constraints when a project must deliver measurable environmental outcomes alongside the United Nations Sustainable Development Goals (SDGs). It argues that quality and risk cannot be managed as residual constraints once time, cost and scope are fixed, because ecological outcomes and deep uncertainty need to be built into the project definition from initiation onward. The argument is illustrated against two documented combined-sewer-overflow interception programmes: the Thames Tideway Tunnel, a £4.6 billion, 25 km project in London, and the DC Clean Rivers Project, a US$2.7 billion multi-tunnel programme in Washington, D.C. Comparing a UK scheme driven by an EU-derived regulatory settlement with a US scheme driven by a federal consent decree shows the framework's constraint interactions recurring under two different governance triggers and two different life-cycle stages, one substantially complete and one still under construction. An illustrative phase-by-constraint-by-SDG mapping is proposed as a planning heuristic. The paper draws its argument from published literature and two documented cases rather than from primary data collection or a statistically representative sample, and its claims should be read accordingly.

References
  • J. R. Turner and R. Müller, "On the nature of the project as a temporary organization," International Journal of Project Management, vol. 21, no. 1, pp. 1–8, 2003, doi: 10.1016/S0263-7863(02)00020-0.
  • R. Gareis, M. Huemann, A. Martinuzzi, C. Weninger, and M. Sedlacko, Project Management and Sustainable Development Principles. Newtown Square, PA, USA: Project Management Institute, 2013.
  • M. M. Carvalho and R. Rabechini, "Can project sustainability management impact project success? An empirical study applying a contingent approach," International Journal of Project Management, vol. 35, no. 6, pp. 1120–1132, 2017, doi: 10.1016/j.ijproman.2017.02.018.
  • Royal Institute of British Architects (RIBA), RIBA Plan of Work 2020 Overview. London, U.K.: RIBA, 2020.
  • J. Hörisch, S. Schaltegger, and R. E. Freeman, "Integrating stakeholder theory and sustainability accounting: A conceptual synthesis," Journal of Cleaner Production, vol. 275, art. no. 124097, 2020, doi: 10.1016/j.jclepro.2020.124097.
  • R. Müller, N. Drouin, and S. Sankaran, "Modeling organizational project management," Project Management Journal, vol. 50, no. 4, pp. 499–513, 2019, doi: 10.1177/8756972819847876.
  • P. Serrador and J. R. Turner, "The relationship between project success and project efficiency," Procedia - Social and Behavioral Sciences, vol. 119, pp. 75–84, 2014, doi: 10.1016/j.sbspro.2014.03.011.
  • T. Aven, "Risk assessment and risk management: Review of recent advances on their foundation," European Journal of Operational Research, vol. 253, no. 1, pp. 1–13, 2016, doi: 10.1016/j.ejor.2015.12.023.
  • United Nations General Assembly, Transforming Our World: The 2030 Agenda for Sustainable Development, A/RES/70/1, New York, NY, USA: United Nations, 2015.
  • S. Grant and R. Bailey, "Thames Tideway Tunnel: purpose, overview, delivery model and financing," Proceedings of the Institution of Civil Engineers – Civil Engineering, vol. 178, no. 6, pp. 7–22, 2025, doi: 10.1680/jcien.25.00091.
  • Comptroller and Auditor General, Thames Tideway Tunnel: Early Review of the Potential Risks to Value for Money, Session 2014-15, HC 168, National Audit Office, London, U.K., Jun. 2014.
  • Comptroller and Auditor General, Review of the Thames Tideway Tunnel, Session 2016-17, HC 783, National Audit Office, London, U.K., Mar. 2017.
  • "Tideway: commissioning ahead of schedule, carbon slashed 28%, cost remains £4.5bn," New Civil Engineer, Jun. 28, 2024.
  • DC Water, District of Columbia, U.S. Environmental Protection Agency, and U.S. Department of Justice, Consent Decree, Civil Action No. 1:00CV00183 (TFH), U.S. District Court for the District of Columbia, 2005 (amended 2016).
  • "D.C.'s $2.7 billion CSS overhaul shows promise for local rivers," Stormwater, Apr. 2021.
  • DC Water, "Anacostia River Tunnel Project," dcwater.com, [Online]. Available: https://www.dcwater.com/projects/anacostia-river-tunnel-project. Accessed Oct. 2026.
  • "DC Water begins major Potomac River tunnel excavation near Watergate," Underground Infrastructure, Jul. 24, 2025.
Index Terms
Computer Science
Information Sciences
No index terms available.
Keywords

Environmental project management project life cycle project constraints sustainable development goals risk management sustainability accounting Thames Tideway Tunnel DC Clean Rivers Project